Project: Improvement of accessibility at Victoria Street Railway Station and the Victoria Street Commuter Car Park for people with disabilities, limited mobility, parents with prams, and tourists with luggage.

Key benefits:

  • Three new lifts, new canopies, refurbishmen...

Stage one of Sinnamon Village Aged Care is scheduled to be open to residents in early 2017. Valued at approximately $53 million, it includes 131 units with a choice of one-, two-, and three-bedroom fully self-contained apartments specifically designed and constructed t...

A project team which consists of CPB Contractors, Aurecon, Arcadis, VicRoads, Public Transport Victoria, and Metro Trains Melbourne will remove the level crossings and rebuild Ginifer and St Albans Stations.

This level crossing removal will include:

  • lowering the rail...

Located at the Brisbane Airport, this project involves the construction of the 5-star Pullman Brisbane Airport Hotel, 3.5-star Ibis Brisbane Airport Hotel, and the Brisbane Airport Conference Centre. This project will be the airport’s biggest third-party development. F...

The redevelopment of Westfield Chermside is currently underway, and is expected to create an exceptional retail destination for Brisbane’s northern region with up to 95 new retailers in a gallery mall plus new dining and entertainment precincts. 

SteelFab AU h...

John Holland and KBR consortium will remove level crossings and rebuild stations at Centre Road in Bentleigh. On location, the rail line will be lowered under the road with Bentleigh station rebuilt to provide street level access down to the platforms. Delivering the l...

Pine Tree Lane is a selection of stylish retail spaces for lease.

These brand new retail shops range from 50sqm up to 400sqm in size, and present an exceptional opportunity for businesses and entrepreneurs to launch a range of ventures from cafes, restaurants, to wine b...

310 Ann Street, Brisbane is undergoing an upgrade of its external facade, and a refurbishment and upgrade of the building internals including retail, commercial and office spaces.

Hosken Steel has been awarded the fabrication, while CSD has been awarded the draftin...

The Star Mountain Plaza development embodies the aspirations of the people of Papua New Guinea (PNG). It is a project that will herald a new era for landowner initiated investments ~ a development by the people of PNG for the people of PNG.

Star Mountain Plaza is an int...

West Kowloon Terminus (WKT) is the terminus of the Hong Kong section of Guangzhou–Shenzhen–Hong Kong Express Rail Link (XRL), and is currently under construction.

It is the only station in the Hong Kong side, and will connect to the mainland Chi...

Please reload

Featured Posts

From the drafting board to completion

November 23, 2017

1/2
Please reload

Recent Posts

January 8, 2018

Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Instagram Social Icon
CSD BIM Australia
CSD Group Australia bim engineering site drafting detailing steel
CSD Engineering Australia
CSD Site Australia

© 2017 by CSD Group Australia Pty Ltd ~ ABN: 91 164 833 176 

Gold Coast, Queensland, Australia